Comlux Completion has taken delivery of the fifth Airbus ACJ TwoTwenty it has been tasked with outfitting at its site in Indianapolis, Indiana. The cabin outfitting begins immediately.
The aircraft was ferried to Indianapolis from Airbus Canada in Montreal, and is delivered as a ‘green’ aircraft.

The cabin completion is scheduled to take 10 months. Comlux Completion said that this lead time is enabled by “streamlined processes and ongoing production innovations”.
The next two ACJ TwoTwenty aircraft are to be delivered to Comlux in November and December 2025. The design, engineering and manufacturing teams in Indianapolis are already working on the definition of these two aircraft, with the aims of ensuring on-time delivery to the end clients, and efficient utilisation of five aircraft bays in the Comlux Completion hangar.
“We are delighted to welcome our fifth ACJ TwoTwenty to Indianapolis,” said Adam White, CEO of Comlux Completion. “As we continue to ramp up with these aircraft, we are fully into the manufacturing phase for this, and the next aircraft. Full speed ahead!”
